看诗词>英语词典>slipway翻译和用法

slipway

英 [ˈslɪpweɪ]

美 [ˈslɪpweɪ]

n.  (造船或修船的)船台,滑台,滑道

复数:slipways 

BNC.34434 / COCA.45822

牛津词典

    noun

    • (造船或修船的)船台,滑台,滑道
      a sloping track leading down to water, on which ships are built or pulled up out of the water for repairs, or from which they are launched

      柯林斯词典

      • 船台(船只下水用的滑道)
        Aslipwayis a large platform that slopes down into the sea, from which boats are put into the water.

        英英释义

        noun

        • structure consisting of a sloping way down to the water from the place where ships are built or repaired
            Synonym:waysshipway

          双语例句

          • This paper briefly introduced the key technique in the construction process of big-diameter and super-depth Cast-in-Situ pile for the8000T block slipway of Tanggu basement.
            简要介绍在塘沽基地8000T级组块滑道工程大直径超深灌注桩施工过程中的关键技术。
          • Brief Introduction of Design and Construction of High-piled Slipway
            高桩滑道工程的设计、施工简介
          • At present, up to slipway longitudinally is widely used in the large or middle shipyards. There are accidents that the ship bottom structure and slipway are damaged during the process of up to slipway all over the world.
            目前船舶纵向上排是大、中型船厂广泛采用的一种上排方式,但在国内和国外的船舶上排过程中船底和船台结构时有受损的事故发生。
          • To a given ship type, friction coefficient, tide height, and the position on the slipway, the launching force should be calculated and the square equation should be solved according to the calculation method established.
            按所确定的计算方法,对给定船型、摩擦系数、潮位及船舶在滑道上的位置,进行下水外力计算和方程求解。
          • An Analysis on Sedimentation of Shipyard Slipway in the Middle and Upper Reaches of the Yangtze River
            长江中上游船舶滑道淤积分析
          • The Vibration Mechanism and Countermeasure of Instability in Low Velocity in Hydraulic Slipway
            液压滑台低速不稳定性机理与控制的研究
          • Shipwright has the slipway, wood seasoning stores and manpower needed to build ships for a strong fleet.
            船坞拥有建造大型船舶所必需的船台、木料仓库和足够人力。
          • Difficulties and innovation of technology concerning renovation of mechanized slipway launching facility
            机械化滑道下水设施改造的技术难点和创新
          • After analyzing the shortage of traditional method of time-resource optimization, this paper applies ( software P3) to the hull-block slipway assembling project. It is proved that the software is more flexible on time-resource ( optimization).
            分析传统工期-资源优化方法的不足,提出应用P3软件进行资源优化,将其运用到船台大合拢分段吊装计划管理中,证实了该软件在资源优化方法上具有一定的多样性和灵活性。
          • Dynamic Simulation Experiment of Launching of Ship ′ s Slipway
            船舶滑道下水水力动态模拟试验研究